Melon management must be in place

How to increase the yield of wax gourd, what problems should be paid attention to when planting?

The first is fertilization: After colonization, every 7 days to 10 days, fertilize once a day (10% to 15% of human excreta or 0.5% to 1% of urea), thin application in the early stage, followed by thick application. The key dressing of wax gourd should be from the introduction of vines to the melon seeds after weighing 4 to 5 kg. Secondly, irrigation and irrigation: The water requirement at the seedling stage is less, and in sunny and warm weather, the soil is sprayed sooner or later when the soil is dry. After the melon vines are put on shelves, the water requirement gradually increases, and the fruiting period reaches the peak. In this period, attention should be paid to frequent watering to keep the soil moist. On sunny days, at least one day should be dribbled (not to be sprayed in the afternoon), and keep the puddle at a water level of 7 to 10 centimeters. Rain should pay attention to remove water. 10-15 days before harvesting, water consumption should be reduced. The water in the puddle should be drained to improve the storage and transportation performance of wax gourd.

Machine Tool Swivel Check

Cnc Rotary Axis Calibrator,Cnc Rotary Axis Calibration,Machine Tool Calibration Tool,Machine Tool Calibration Instrument

Automated Precision Inc. , https://www.apiasean.com